dot
Detailansicht
Katalogkarte GBA
Katalogkarte ISBD
Suche präzisieren
Drucken
Download RIS
Hier klicken, um den Treffer aus der Auswahl zu entfernen
Titel Hydrological impacts of floodplain restoration: a case study of the River Cherwell, UK
VerfasserIn M. C. Acreman, R. Riddington, D. J. Booker
Medientyp Artikel
Sprache Englisch
ISSN 1027-5606
Digitales Dokument URL
Erschienen In: Hydrology and Earth System Sciences ; 7, no. 1 ; Nr. 7, no. 1, S.75-85
Datensatznummer 250004422
Publikation (Nr.) Volltext-Dokument vorhandencopernicus.org/hess-7-75-2003.pdf
 
Zusammenfassung
This paper investigates the impacts on floods of hypothetical changes to river channel geometry by construction or removal of embankments to prevent water spreading onto the floodplain at high flows. A numerical model is applied to the River Cherwell between Oxford and Banbury to simulate changes to flood hydrographs. Embanking the river increases the peak flows downstream by 50-150%. Restoring the river channel through the floodplain to pre-engineered dimensions reduces peak flow by around 10-15% and increases peak water levels within the floodplain by 0.5-1.6 m. These results suggest that floodplain rehabilitation, in terms of embankment removal or returning the channel to pre-engineered dimensions, can be a valuable part of the flood management strategy of a catchment. Both measures lead to increased inundation of the floodplain, which can be positive for ecological restoration.

Keywords: floodplains, hydrological impacts, rehabilitation, flood frequency

 
Teil von