dot
Detailansicht
Katalogkarte GBA
Katalogkarte ISBD
Suche präzisieren
Drucken
Download RIS
Hier klicken, um den Treffer aus der Auswahl zu entfernen
Titel GOCE satellite status and mission overview
VerfasserIn Michael Fehringer, Danilo Muzi, Rune Floberghagen, Juan Pineiro, Christoph Steiger
Konferenz EGU General Assembly 2010
Medientyp Artikel
Sprache Englisch
Digitales Dokument PDF
Erschienen In: GRA - Volume 12 (2010)
Datensatznummer 250035755
 
Zusammenfassung
After completion of commissioning and instrument calibration in July 2009 and subsequent decay to its nominal operational altitude of 255 km, GOCE entered nominal science operations on 29 September 2009. The selected orbit allows mapping the Earth once every 61 days with a longitudinal separation of ascending node crossings at the equator of less than 0.4 degrees. The first complete mapping generating an uninterrupted data set of 61 days was achieved in December 2009. The mission has been continued at the same altitude ever since. This presentation will focus on the satellite status and performance and on the observations performed so far. An outlook on future mission planning will also be given.