dot
Detailansicht
Katalogkarte GBA
Katalogkarte ISBD
Suche präzisieren
Drucken
Download RIS
Hier klicken, um den Treffer aus der Auswahl zu entfernen
Titel Simultaneous Ensemble Post-Processing for Multiple Lead Times with Standardized Anomalies
VerfasserIn Markus Dabernig, Jakob W. Messner, Georg J. Mayr, Achim Zeileis
Konferenz EGU General Assembly 2017
Medientyp Artikel
Sprache en
Digitales Dokument PDF
Erschienen In: GRA - Volume 19 (2017)
Datensatznummer 250143402
Publikation (Nr.) Volltext-Dokument vorhandenEGU/EGU2017-7118.pdf
 
Zusammenfassung
Statistical post-processing of ensemble predictions is usually adjusted to a particular lead time so that several models must be fitted to forecast multiple lead times. To increase the coherence between lead times, we propose to use standardized anomalies instead of direct observations and predictions. By subtracting a climatological mean and dividing by the climatological standard deviation, lead-time-specific characteristics are eliminated and several lead times can be forecasted simultaneously. The results show that forecasts between +12 and +120 h can be fitted together with a comparable forecast skill to a conventional method. Furthermore, forecasts can be produced with a temporal resolution as high as the observation interval e.g., up to ten minutes.