dot
Detailansicht
Katalogkarte GBA
Katalogkarte ISBD
Suche präzisieren
Drucken
Download RIS
Hier klicken, um den Treffer aus der Auswahl zu entfernen
Titel Current Status Of The GRACE Follow-On Mission
VerfasserIn Frank Flechtner, Frank Webb, Michael Watkins, Felix Landerer, Christoph Dahle, Srinivas Bettadpur
Konferenz EGU General Assembly 2017
Medientyp Artikel
Sprache en
Digitales Dokument PDF
Erschienen In: GRA - Volume 19 (2017)
Datensatznummer 250141096
Publikation (Nr.) Volltext-Dokument vorhandenEGU/EGU2017-4566.pdf
 
Zusammenfassung
As of the time of this abstract submission, the GRACE Follow-On satellites have been constructed and transferred to Ottobrunn near Munich for several months of operational testing in the IABG test centre. The Russian/Ukraine Dnepr launcher had to be exchanged and a corresponding new contract has been signed by GFZ and Iridium Satellite LLC. This includes a "Rideshare" between GRACE-FO and 5 Iridium-Next satellites on a Space-X Falcon-9 from Vandenberg Air Force Base in California within the launch period December 2017 till February 2018. The project team is conducting tests of satellite and instrument operation and performance and evaluating updated simulations of expected performance on-orbit, including the assessment of inter-satellite ranging (for both microwave and laser instruments), accelerometer, thermal variability and deformation, and other instrument and measurement errors. In addition, all required ground analysis software of the Science Data System is in development and being tested at JPL, UTCSR, and GFZ, in preparation for fully integrated end-to-end (international) testing from Level-1 through Level-3 data within 2017. In this presentation, we will provide the detailed status of project integration and test, the latest simulations of science performance, and a revised schedule for remaining project milestones.