dot
Detailansicht
Katalogkarte GBA
Katalogkarte ISBD
Suche präzisieren
Drucken
Download RIS
Hier klicken, um den Treffer aus der Auswahl zu entfernen
Titel GOCE mission status and plans for the last year of operation
VerfasserIn Michael Fehringer, Rune Floberghagen, Bjoern Frommknecht, Christoph Steiger, Massimo Romanazzo
Konferenz EGU General Assembly 2013
Medientyp Artikel
Sprache Englisch
Digitales Dokument PDF
Erschienen In: GRA - Volume 15 (2013)
Datensatznummer 250079194
 
Zusammenfassung
Launched in March 2009, GOCE has by far exceeded its nominal 12 months mission lifetime and has achieved its scientific goals. The mission will terminate by the end of 2013 with the exhaustion of the Xenon fuel to power the electric propulsion system for drag-free control. To make best use of the remaining lifetime and in particular to further exploit the satellite’s unique capabilities to determine small scale features of the Earth’ gravity field its operational orbit has been lowered from 255 to 235 km during the second part of 2012 and early 2013. The presentation will provide the mission status and operational plans for the last year of the mission. Both the space and ground segments will be covered.