dot
Detailansicht
Katalogkarte GBA
Katalogkarte ISBD
Suche präzisieren
Drucken
Download RIS
Hier klicken, um den Treffer aus der Auswahl zu entfernen
Titel GOCE PDGS Level 1b and Level 2 processing status
VerfasserIn B. Frommknecht, R. Floberghagen, A. Bigazzi, L. Mizzi, M. Meloni
Konferenz EGU General Assembly 2012
Medientyp Artikel
Sprache Englisch
Digitales Dokument PDF
Erschienen In: GRA - Volume 14 (2012)
Datensatznummer 250062151
 
Zusammenfassung
The GOCE mission is in orbit since spring 2009 and is systematically collecting gravity gradients from space. As of today about 23 months of high quality gravity field data have been observed enabling to estimate the static gravity field of the Earth solely from satellite data with a spatial resolution of about 100 km and an accuracy of a few centimetres globally. Currently GOCE is in its extended mission, which is planned to last until December 2012. This paper gives and overview of the Level 1b and Level 2 processing status in terms of data availability on and completeness. In addition the updates that have been implemented for the gradiometer data processing chain are described.