dot
Detailansicht
Katalogkarte GBA
Katalogkarte ISBD
Suche präzisieren
Drucken
Download RIS
Hier klicken, um den Treffer aus der Auswahl zu entfernen
Titel A Rapid Deployment Seismological network (RaDeSeis) for real time aftershock studies
VerfasserIn G. Hloupis, F. Vallianatos, J. P. Makris
Konferenz EGU General Assembly 2009
Medientyp Artikel
Sprache Englisch
Digitales Dokument PDF
Erschienen In: GRA - Volume 11 (2009)
Datensatznummer 250024499
 
Zusammenfassung
The understanding of earthquake faulting process is one of the main factors that contribute to earthquake damage. One of the most valuable and essential tools for the understanding of faulting process in the analysis of aftershocks. The critical point for successful aftershock studies is the mobile seismological network that will deployed in order to provide the required data. The main problem that arise for these networks is how fast the recorded data are available to data centres in order to estimate the focal mechanisms, the source parameters estimation as well as to examine microseismic activity. The ideal situation is to have these data available in real time but this is limited by the different telemetry requirements for every individual installation. Based on the experience gained from several installations in Hellenic Seismological Network of Crete (HSNC) we propose a mobile network scheme (called RaDeSeis) capable of installed in a limited amount of time and provide real time seismological data. RaDeSeis is an hybrid network based on VSAT and WiFi communication links between seismological stations and data centre. The network is deployed in star topology where the central station is the communication hub at the same time. Dedicated point-to-point links between central station and border station established using WiFi links. Communication between central station and data centre is established by VSAT. With appropriate routing on central station the data centre is collecting, control and monitor all the stations from the area of interest in real time. In order to decrease the time needed for each installation a specific software (RaLiEs – Rapid Link Establishment) is originated for the quicker link establishment between border stations and central station (with an average distance of 40km LOS) as well as to data centre. By using this software each telecommunication installation needs less than half an hour to complete the necessary link adjustments. Acknowledgements This work is partially supported by SE-RISK Project (INTERREG III, STRAND B ARCHIMED)/Axis: Integrated and Sustainable Management of Cultural and Natural Resources and of Landscape and Risk Management)